Portfolio cost benchmarking · Advisory · Canada

Know what your capital projects should cost, before you approve the next one.

We turn your project history into a benchmark your teams can use: normalized unit costs, ranges and cost drivers for every type of project you deliver, from fit-outs to roofs, chillers and generators.

For asset managers, real-estate leaders, facility managers and engineers, and CFOs responsible for hundreds of buildings.

The situation

Does this sound familiar?

A $1.2M chiller replacement is approved. Nobody can say if it was a good price.

Next year’s capital plan starts from this year’s, plus a percentage.

A single-source quote comes in, and there is no reference to challenge it.

Two regions estimate the same work and land far apart.

Cost data sits in finance. Drawings and contracts sit with projects. Nobody connects them.

Overruns are explained after the fact, never seen coming.

The problem

Your data records what you spent. It cannot tell you how well.

Large organizations track capital spending closely. But a total answers a finance question, not a capital management one.

A finance number

$1.2M

What you spent on a chiller replacement. It tells you how much, not whether it was a good price.

A capital management number

$6,000 per ton

What that 200-ton air-cooled chiller cost per ton. You can compare it with your other chiller projects, with last year, with another region.

Why projects cannot be compared as paid

Different dates

A 2018 project and a 2025 project are paid in different dollars.

Different places

Labour and access cost more or less from one region to the next.

Different scopes

A roof replaced with new insulation is not the same project as one replaced without.

Different sizes or capacities

A 50-ton chiller and a 500-ton chiller do not cost the same per ton.

Averaging them anyway gives a number that looks precise, and misleads.

Our approach · 1

First, make projects comparable

Every project goes through the same adjustments, in the same order.

01

As paid

The final cost, from your financial data.

02

Same date

Escalated to today’s dollars.

03

Same place

Adjusted for location.

04

Same scope

Classified by type, size and cost drivers. Items that are not comparable are set aside.

05

Comparable unit cost

Per square foot, per ton, per kW: ready to compare.

Our approach · 2

Classify every project the same way

Each category is split by project type and by the cost drivers that move its price, then compared on its own unit.

Fit-outs

$/sq ft · $/employee

Roofing and envelope

$/sq ft

HVAC and refrigeration

$/ton

Electrical

$/kW

Fire protection

$/sq ft served

Plumbing

$/fixture

Elevators

$/stop

Site work

$/sq ft paved

Example · how a roof is classified

Roof system
Asphalt shingleModified bitumenSingle-ply membrane
Insulation
AddedNot added
Height and access
Low-riseMid-riseHigh-rise
Rooftop equipment and penetrations
LightModerateDense
Layers removed
OneTwo or more

Each project is also tagged by why it was done:

Lifecycle

Systems and equipment at the end of their useful life.

Strategic

Work that serves a business need: growth, consolidation, a new way of working.

Risk reduction

Work that prevents a failure and a disruption to operations.

Regulatory

Work required by a code, a standard or an authority.

See every category and its cost drivers
CategoryTypical projectsClassified byUnit
Fit-outs and interior worksOffice fit-outs, interior renovationsScope level, area, density (employees per area), quality level, base building conditionSquare foot, employee
Roofing and building envelopeRoof replacement, envelope replacementRoof system (asphalt shingle, modified bitumen, single-ply membrane), insulation added or not, building height and access, rooftop equipment and penetrations, layers removedSquare foot of roof or wall
HVAC and refrigerationRTU, AHU, CRAC and CRAH units, chillers, DDC and controlsEquipment type and capacity, air- or water-cooled, rooftop or mechanical room, crane lift, controls integrationTon of cooling, unit
Electrical systemsGenerator, UPS and battery replacementCapacity, indoor or outdoor, fuel type, transfer switches, battery type, redundancykW, kVA
Fire protectionFire alarm upgrades, sprinkler systemsSystem type (wet, dry, pre-action), area covered, number of devices, occupied buildingSquare foot served, device
PlumbingPlumbing system replacementPiping replaced, number of fixtures, building heightFixture, square foot
ElevatorsElevator replacementHydraulic or traction, number of stops, capacityElevator, stop
Site workAsphalt repavingMill and overlay or full reconstruction, base repairs, drainageArea paved

Our approach · 3

Then analyze. Don’t just average.

A benchmark your teams can rely on needs real analysis behind it, and a method anyone can check.

01

Data validation

Every project is checked against its actual costs and construction documents before it enters the sample.

02

Outlier identification

Unusual projects are flagged and explained, never silently removed or kept.

03

Cost-driver analysis

We measure which factors move the unit cost, and by how much.

04

Sensitivity analysis

We show how results change when key assumptions change, such as escalation, location or size.

05

Stated ranges, not single numbers

Each benchmark comes with its sample size and its spread, so you know how far to trust it.

06

A method that can be proven wrong

Assumptions and data are written down. Each new project tests the benchmark, and the benchmark is corrected when it fails.

Our approach · 4

Turn it into information people use

Samples of what the report shows. Figures are indicative only. Yours is built from your own projects.

Roof replacement: cost per sq ft

020406080100Asphalt shingle$8–12Modified bitumen · Montréal$40–60Modified bitumen · Toronto$60–90$ PER SQ FT

Indicative ranges, before location adjustment. Same system, different city, different cost.

Useful for: capital planning and project budgets.

Outliers, flagged and explained

REFERENCE RANGEPortfolio medianOutside the rangeLowerHigherCHILLER REPLACEMENTS · COST PER TON
Useful for: pricing reviews, single-source prices and lessons learned.

What drives the cost

Crane liftWater-cooledOccupied buildingControls integrationEffect on unit cost, largest first
Useful for: scoping and value decisions.

Estimate against final cost

On budgetEach line is one project. Gold = outside tolerance.Over budget ↑
Useful for: estimating, approvals and contingency setting.

Implementation

From your files to a working benchmark

We set up the benchmark in your organization, then keep it current, so it keeps paying off after the first report.

  1. 01

    Collect

    Final costs, invoices and construction documents from your systems.

  2. 02

    Classify

    By type, cost drivers and reason, so like is compared with like.

  3. 03

    Normalize

    Same date, same place, same scope, with validated data.

  4. 04

    Analyze

    Outliers, cost drivers and sensitivity, against your history, regions and peers.

  5. 05

    Report

    Unit cost ranges and targets your teams can use in the next budget.

  6. 06

    Embed

    A classification standard, a data template and a yearly update.

What you receive

  • A clean, classified and normalized cost record of your past projects.
  • Unit cost ranges for each project type: per square foot, per ton, per kW and more.
  • The cost drivers behind your unit costs, and the outliers, explained.
  • Target ranges for capital planning, project budgets and single-source price reviews.
  • A classification standard and a data template for future projects.
  • A short summary for your finance team and your board.

What we need

Your financial data and construction documents.

Project costs and invoices, plus drawings, specifications and contracts. Your organization already holds them. Nothing else to start.

Why Xenofan

Why we can help

6 years

building benchmark reports for a publicly listed organization

1,000+

projects a year in that portfolio

$100M+

in projects a year

Over six years, our principal developed benchmark reports for a publicly listed organization delivering thousands of projects a year, worth hundreds of millions of dollars. Those reports became the reference point for capital planning, project budgeting and validating single-source pricing.

Three disciplines, one team

Cost engineering

To measure: unit costs, ranges and the drivers behind them.

Building engineering

To understand the systems and conditions behind each cost.

Construction management

To know how projects are really delivered, and what that costs.

One project. One role. Never both.

We are paid by our clients only. If we benchmark or advise on a project, we never bid on it, build it or manage it. Your numbers are measured by someone with nothing to sell you.

You cannot improve what you have never compared.

Martial Youadjeu, Principal, Xenofan

Next step

Start with the projects you already have.

Tell us how many projects you deliver a year, and in which categories.

  1. A call to understand your portfolio and your decisions.
  2. A first look at a sample of your data.
  3. A written proposal before anything starts.