Accurate Building Cost Estimates: A Guide for CRE Managers

Course objectives and contents

The general objective of this course is to explain the fundamentals of cost estimation to engineers, managers, and professionals involved in the construction industry. At the conclusion of the course, the professional should be able to develop a critical opinion and contribute to discussions related to cost estimation and cost engineering. The following key questions will be covered.

  1. Understanding Cost Estimation: What constitutes cost estimation, and what skill sets are essential for proficient cost estimators?

  2. Steps in Cost Estimation Development: Which sequential steps are necessary to formulate a comprehensive cost estimate?

  3. Falsification Criteria for Cost Estimates: What criteria are utilized to assess the validity and accuracy of a cost estimate?

  4. Post-Estimate Actions: What actionable steps should be taken subsequent to the development of a cost estimate?

  5. Project Delivery Methodologies: How can one differentiate between the various project delivery methods commonly employed in the construction industry?

  6. Example of Cost Estimate Development: Can participants review a practical example illustrating the process of generating both a high-level and preliminary cost estimate


    Course materials and resources

    This course is comprised of four components:

  • 50-page Course Notes: These notes are designed to assist you in recalling and revisiting the topics covered during the lecture.

  • Video Presentations: These presentations are conducted by the facilitator, who will elucidate the course's theoretical concepts.

  • Case Study Video Presentation: In this session, the facilitator will delve into a case study, guiding you through the development of both a high-level and preliminary cost estimate.

  • Course Test: This test consists of multiple-choice questions, providing you with an opportunity to evaluate your learning progress.


Forecost · by Xenofan

Estimate your fit-out cost before you sign the lease.

Enter your space requirements. Forecost returns a preliminary budget with its estimate class, key assumptions and an indicative schedule, in under 30 minutes and without drawings.

For corporate real estate and finance teams at the earliest stage of a relocation or expansion.

Estimating Building Costs. Cost estimation course reviews.

“The greatest investment a young person can make is in their own education, in their own mind. Because money comes and goes. Relationships come and go. But what you learn once stays with you forever”

Budget before design

Set your project budget before design begins.

Once design starts, costs tend to grow with the drawings. Xenofan establishes an early budget from your space requirements and target move-in date, with a stated accuracy range, so design starts with a financial target, not a blank cheque.

For corporate real estate, finance and project leaders planning a relocation, an expansion or a lease renewal.

Get a budget before design →Reply within one business day.
Précédent
Précédent

Workplace Strategy: How to Calculate Your Space Needs

Suivant
Suivant

Target Costing: Designing to Your Construction Budget